We removed an existing bridge that spanned a 20’ creek along with two 16’ ramps leading up to the bridge. We used the existing support poles to carry the weight of the new bridge. New concrete footers were poured for the ramps on either side. The bridge was built with treated lumber and finished with aluminum balusters to help it stand out.